Abstract
This study is concerned with the optimal scheduling of an electricity power system consisting of both hydro and thermal units. Using Lagrangian relaxation, the original primal problem may be rewritten in a dual formulation; the problem then admits decomposition into more tractable subproblems. This feature enables implementation on a transputer array with significant reductions in the computation time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have