Abstract

The 3-GeV beam accelerated by J-PARC Rapid-Cycling Synchrotron (RCS) was successfully extracted to the beam dump located at the beam transport to the neutron production target. The present status of the J-PARC accelerator development, in particular, that of the RCS, is reported together with the overview and future plan of the J-PARC project. It is presented how the new accelerator technologies developed for the J-PARC will contribute a lot to the world-wide progress of the proton accelerator field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.