Abstract
Taking deformation of the main arch under dead load as the arch alignment control target, the overall cable force and pre-camber of multi-rib arch were calculated by zero-order optimization method. According to the installation sequences of arch segments, taking deviation of cable tower, cables in one-time tensioning method and the section stress of arch chords as constraint conditions, the cable force and pre-camber for every segment were calculated by iterative method. This method is applied to the erection of a 400m steel truss arch bridge with three ribs, the calculated values of cable force are anastomosed with the measured ones, and the precision of arch alignment is high.