Abstract

The chemo-hydro-mechanical (CHM) interaction between swelling Eurobitum radioactive bituminized waste (BW) and Boom Clay is investigated to assess the feasibility of geological disposal for the long-term management of this waste. These so-called compatibility studies include laboratory water uptake tests at the Belgian Nuclear Research Center SCK•CEN, and the development of a coupled CHM formulation for Eurobitum by the International Center for Numerical Methods and Engineering (CIMNE, Polytechnical University of Cataluña, Spain).In the water uptake tests, the osmosis-induced swelling, pressure increase and NaNO3 leaching of small cylindrical BW samples (diameter 38mm, height 10mm) is studied under constant total stress conditions and nearly constant volume conditions; the actual geological disposal conditions should be intermediate between these extremes. Two nearly constant volume tests were stopped after 1036 and 1555days to characterize the morphology of the hydrated BW samples and to visualize the hydrated part with microfocus X-ray Computer Tomography (μCT) and Environmental Scanning Electron Microscopy (ESEM). In parallel, a coupled CHM formulation is developed that describes chemically and hydraulically coupled flow processes in porous materials with salt crystals, and that incorporates a porosity dependent membrane efficiency, permeability and diffusivity.When Eurobitum BW is hydrated in (nearly) constant volume conditions, the osmosis-induced water uptake results in an increasing pressure to values that can be (in theory) as high as 42.8MPa, being the osmotic pressure of a saturated NaNO3 solution. After about four years of hydration in nearly constant volume water uptake tests, pressures up to 20MPa are measured. During this hydration period only the outer layers with a thickness of 1–2mm were hydrated (as derived from μCT and ESEM analyses), and only about 10–20% of the initial NaNO3 content was released by the samples. In the studied test conditions, the rates of water uptake and NaNO3 leaching are low because of the low porosity, and thus low permeability, of the hydrated BW samples in combination with a highly efficient semi-permeable bitumen membrane. In contrast to the hydration in free swelling conditions, the increase in porosity is limited by the high pressures in the nearly constant volume tests. Furthermore, at the interface with the stainless steel filters, a low permeable re-compressed bitumen layer is formed, as observed on the ESEM images.The experimental results of pressure increase and NaNO3 leaching, as well as observations on μCT and ESEM images (e.g. compression of leached layers, high dissolved NaNO3 concentration in hydrated BW after about four years), were reproduced rather successfully by the coupled CHM formulation for Eurobitum BW. A long-term model prediction of the evolution of the osmosis-induced pressure in the nearly constant volume tests shows that the pressure would reach a maximal value of about 20MPa after about 5.5years, after which the pressure would start to decrease. After 10,000days (∼27years) the pressure would have decreased to a value of ∼2MPa.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.