Abstract

Increasing the quality of organizational and technological solutions in construction is one of the main tasks facing the construction industry. The actual methods of solving the problem of setting organizational and technological design are directly related to the integration of specialized software in the planning and design of construction projects, especially for unique, complex projects, projects implemented in tight time and construction sites in the current urban development. The existing need to process a significant amount of information at short intervals and to link design decisions to the dynamic environment of the construction site is not an easy task, but a realizable one. Within the framework of the research work carried out at the department of MGSU, the expediency of applying operational assessments of the parameters of organizational and technological solutions based on mathematical methods has been established. The proposed method for forecasting and evaluating the integral parameters of design solutions is based on a neural network model, the method used involves the formation of a training matrix comprising key indicators of implemented (pilot) ones.

Highlights

  • Methods of computer modeling are developing along the path of building a coordinate system and 3D models are being transformed into 6D models, which include, in addition to spatial coordinates, time, cost, and technological [1]

  • It is advisable to concentrate on aspects that can be modeled with modern information systems, one of which is the weak linkage of organizational and technological solutions in parallel and in-line methods of work [4]

  • It is necessary to take into account the list of risks that accompany the implementation of technological solution options [10]

Read more

Summary

Introduction

Methods of computer modeling are developing along the path of building a coordinate system and 3D models are being transformed into 6D models, which include, in addition to spatial coordinates, time, cost, and technological [1]. Despite the seemingly high efficiency of the work of design organizations, compliance with the schedule of work by the contractor organization remains an extremely difficult task, and for frequent and unachievable for objective reasons and the impacts of anthropogenic and social nature that arise during the implementation of the project. In this case, it is advisable to concentrate on aspects that can be modeled with modern information systems, one of which is the weak linkage of organizational and technological solutions in parallel and in-line methods of work [4] It is advisable to concentrate on aspects that can be modeled with modern information systems, one of which is the weak linkage of organizational and technological solutions in parallel and in-line methods of work [4].

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.