Abstract

Abstract As one of the important renewable energy, hydropower is experiencing a booming development period throughout the world in recent years. By the end of 2016, hydropower has occupied 20.1% installed capacity and 19.5% generation in China. Thus, it is of great importance to develop some effective methods to guarantee the overall generation benefit of hydropower system. As a famous optimization tool to solve this problem, the progressive optimality algorithm cannot effectively handle with large-scale hydropower system because its computational burden grows exponentially with the increasing number of hydroplants. Thus, in order to effectively alleviate the dimensionality problem, a novel method called uniform progressive optimality algorithm is introduced here. In the presented method, the complex multistage problem is firstly divided into several two-stage optimization subproblems, and then the uniform design is adopted to sample a small subset from all the possible state vectors at each subproblem, while the successive approximation strategy is adopted to gradually improve the quality of solution. The results from a real-world hydropower system of China indicate that compared with progressive optimality algorithm, the proposed method has superior performance in execution efficiency and convergence speed, which is an effective alternative method for the complex hydropower system operation problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.