Abstract
In this paper, the traditional automatic generation control loop with modifications is incorporated for simulating automatic generation control (AGC) in restructured power system. Federal energy regulatory commission (FERC) encourages an open market system for price based operation. FERC has issued a notice for proposed rulemaking of various ancillary services. One of these ancillary services is load following with frequency control which comes broadly under Automatic Generation Control in deregulated regime. The concept of DISCO participation matrix is used to simulate the bilateral contracts in the three areas and four area diagrams. Hybrid particle swarm optimization is used to obtain optimal gain parameters for optimal transient performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Power & Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.