Abstract
AbstractFour different end‐of‐pipe waste‐treatment processes applicable to mechanical pulp and paper manufacture were modelled. Calculated costs for an average mill were capital $34–$44 million, operating cost $3.5–$6 million/year and discounted (10 years) $60–$85 million. Compared with mill reported values, capital and operating costs of activated sludge treatment (AST) were higher by 17 and 29%, respectively; those for aerated stabilization basin (ASB) were higher by 27 and 180%. Major variables affecting the costs were BOD and TSS levels and the wastewater‐to‐pulp ratio. It was concluded that ASB is more economical than AST and that anaerobic treatment plus AST could be advantageous at high BOD levels.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.