Abstract

Jinsha river has very abundant hydro power reservation, ranking first in all the hydro power bases of China. To deliver the 38-GW hydro power from Jinsha power stations by HVDC transmission lines to load centers 1000-2000 km away, it is necessary to determine the right voltage level and the capacity of each bipole. This paper proposes three preliminary power delivery scheme and presents an optimization method for transmission capacity, dc voltage and conductor size. Based on a comprehensive comparison of cost-effectiveness, technical feasibility and network security and stability, it was recommended that the 3 bipolar plusmn 800-kV ultra HVDC (UHVDC) links with rated capacity of 6.4 GW for each link be adopted as transmission scheme of phase I hydro power station on Jinsha River.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.