Abstract

PT OSIN is a company that runs a business in the automotive manufacturing sector. The company applies a flow shop production model whose production pattern is line to line in series using the First Come First Serve production scheduling method. The problem with the FCFS method which is considered to have not reached the optimal enough in meeting uncertain product demands, causing delays in the production schedule, which has an impact on the flow or distribution of goods and can lead to increased production in activities. The proposed improvement method is made to optimize production scheduling, focusing on minimizing the makespan values in the scheduling system's order. This study uses a heuristic approach to the Campbell, Dudek, Smith (CDS) algorithm in overcoming scheduling problems. The CDS method is a production scheduling heuristic method developed from the Johnson algorithm in obtaining several sequences of 6 types of work processes at the work center which aims to analyze the total time for each processing process (makespan). Comparing the two methods using the FCFS method by sorting the scheduling according to the order of the initial order time produces a total value of 2,408.75 minutes, while using the CDS algorithm which uses 5 iterations produces a minor matter of 881.3 minutes. Comparing the results obtained by applying the scheduling system with the CDS method can be used as a proposed improvement in overcoming the delay in delivery and the production scheduling process.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call