Abstract

To address the severity of the wind and light abandonment problem and the economics of hydrogen energy production and operation, this paper explores the problem of multi-cycle resource allocation optimization of hydrogen storage systems for coal–wind–solar power generation. In view of the seriousness of the problem of abandoning wind and photovoltaic power and the economy of hydrogen production and operation, the node selection and scale setting issues for hydrogen production and storage, as well as decision-making problems such as the capacity of new transmission lines and new pipelines and route planning, are studied. This research takes the satisfaction of energy supply as the basic constraint and constructs a multi-cycle resource allocation optimization model for an integrated energy system, aiming to achieve the maximum benefit of the whole system. Using data from Inner Mongolia, where wind abandonment and power limitation are severe, and Beijing and Shanxi provinces, where hydrogen demand is high, this paper analyzes the benefits of the hydrogen storage system for coal–wind–solar power generation, and explores the impact of national subsidy policies and technological advances on system economics.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.