Abstract

In order to optimize the gas drilling in pre-pumping coal seam and strengthen the gas emission effect, This paper uses Chenggui high-speed railway Baiyanglin tunnel as the research object. The FLUENT numerical simulation software is used to simulate the change of coal seam gas pressure during the process of gas emission and the influencing factors of the effect of gas emission. According to the numerical simulation results, the parameters including hole spacing, hole depth and aperture are optimized. The results show that the recommended diameter of the pre-emission gas is 75 ∼ 100mm, the drilling depth is 1.5 ∼ 2.5m, and the hole spacing is 2m.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.