Abstract

Rural preferential loans usually take the form of portfolio credits. From the perspective of public interest, the total delay time for obtaining loans is expected to be minimized. To use rural portfolio credits effectively, the two-dimensional strip packing grouping delay problem (2SPGDP) is improved to optimize the rural portfolio credit granting system. First, 2SPGDP is established by adding grouping constraints and the latest start time constraints to the two-dimensional strip packing problem, and the total delay is taken as the optimization objective. Second, based on the depth search reverse spanning tree (DSRST) and the insert spare space (ISS) method, the branch-and-bound reverse order insert algorithm (BB-RIA) is designed. Finally, the lag pruning operator (LPO) is designed to reduce lag. The improved model (2SPGDP) and BB-RIA-LPO algorithm are used to solve several classical two-dimensional strip packing problems and a specific rural portfolio credit case. Compared with the Bottom-Left and Branch and Bound Algorithm, our model and algorithm improve the success rate by 25% and reduce the total delay by 6%. The case of rural portfolio credit illustrates the operability and effectiveness of this method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.