Abstract

The leach solutions of waste printed circuit boards contain a variety of base as well as precious metals with different concentrations. So, it is necessary to recover such metals for downstream processing of leach solutions. Cementation process is widely used at the industrial scale due to lower operational cost. In the present study, recovery of copper was performed by scrap iron and aluminium as cementing agents. Use of scrap iron resulted in a 99% copper recovery. Effects of different process parameters were studied to achieve maximum copper recovery. Kinetic study of copper cementation showed that the rate-controlling step was diffusion and the activation energy was 38.83 kJ/mol. Using flask data, the scale-up study was carried out with scrap iron for 8 L of the pregnant bio-leach solution. Complete recovery of copper was achieved within 120 min of reaction time in the scale-up study. The purity of recovered copper was 93% after the recovery process. Scanning electron microscopy with energy dispersive X-ray spectroscopy (SEM- EDX) and X-ray powder diffraction (XRD) analysis of recovered copper was performed to characterize the recovered metal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.