Abstract
ABSTRACTFrom the economical viewpoint in reliability theory, this paper addresses a scheduling replacement problem for a single operating system which works at random times for multiple jobs. The system is subject to stochastic failure which results the imperfect maintenance activity based on some random failure mechanism: minimal repair due to type-I (repairable) failure, or corrective replacement due to type-II (non-repairable) failure. Three scheduling models for the system with multiple jobs are considered: a single work, N tandem works, and N parallel works. To control the deterioration process, the preventive replacement is planned to undergo at a scheduling time T or the job's completion time of for each model. The objective is to determine the optimal scheduling parameters (T* or N*) that minimizes the mean cost rate function in a finite time horizon for each model. A numerical example is provided to illustrate the proposed analytical model. Because the framework and analysis are general, the proposed models extend several existing results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.