Abstract

In reality, most operating systems are repaired or replaced when they have failed. For such systems, it would be reliable to maintain them in a control-limit consideration of repairs or operations. This article addresses a system scheduling policy for preventive replacement with discrete control limits of minimal repair and random work. An operating system which works at random times for multiple jobs (N tandem jobs or N parallel jobs) is considered. The system subjects to two failure mechanisms and maintained imperfectly: type-I (minor) failure rectified by a minimal repair and type-II (catastrophic) failure removed by a corrective replacement. To control the deterioration process, the preventive replacement is planned to undergo before catastrophic failure at number n of minimal repairs or the completion of N multiple jobs. The objective is to determine the optimal discrete scheduling replacement parameters (n* or N*) that minimizes the mean cost rate function in a finite time horizon. Model analysis relating to the existence and uniqueness of optimal solutions is provided. A Numerical example is presented for illustrative purposes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call