Abstract

In order to solve the problem of new energy consumption, a combined electric and heating system (CEHS) dynamic optimal scheduling method considering the optimal control of combined heat and power (CHP) unit and electric boiler is proposed from the perspective of unit technology transformation, to optimize the thermoelectric coupling relationship and improve the regulation capacity of the CEHS. Firstly, the electric and heat output models of CHP units considering the optimal control process, were constructed and used to analyze the electric–thermal characteristics and the impact of unit pressure safety under variable load input. On this basis, CHP units, electric boilers, wind power units, and thermal power units are optimally scheduled to minimize system operating costs. Finally, a simultaneous method of “discrete first, optimize later” is proposed to solve the dynamic optimal scheduling problem. The simulation results verify that the optimal scheduling considering the optimal control of CHP units and the retrofitting of electric boilers can promote the consumption of wind power and improve the overall operating economy of the system while ensuring the feasibility of the CEHS scheduling scheme.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call