Abstract

In recent years, the rapid development of wind power generation and the low load growth rate have brought challenges to the peak regulation of power grid in Northeast China. In order to solve the peak regulation problem, virtual power plant (VPP) is proposed to participate in the peak regulation auxiliary service market in Northeast china, especially for deep peak regulation. Firstly, two modes of peak regulation in Northeast China are introduced in this paper, which are thermal power unit and VPP. With the definition of the peak regulation capacity for VPP, the Optimal Scheduling Model of VPP participating in peak regulation ancillary service is established. The simulations are carried out in MATLAB. The results show that the economy of peak regulation is significantly improved in peak regulation auxiliary service based on VPP.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call