Abstract

An integrated multi-stage supply chain with time-varying demand over a finite planning horizon is considered in this paper. The objective is to devise the optimal production-inventory policy to minimize the total operational cost. The model is formulated as a mixed integer nonlinear programming problem. The problem is represented as a weighted directed acyclic graph. The global minimum total operational cost is computed in polynomial time by the developed algorithm. Two numerical examples of a seasonal product and a product over its life cycle are studied to illustrate the results. A sensitivity analysis of the system parameters is conducted to assist the supply chain decision makers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.