Abstract
Phasor measurement units (PMUs) provide synchronized measurements of real-time phasors of voltages and currents. It is considered as an important element of the smart wide area measurement system used in advanced power system monitoring, protection, and control applications. This paper proposes a new approach based on a greedy algorithm to solve the optimal phasor measurement unit placement (OPP) problem in the power network. The main purpose of proposed approach is to find out a high-quality solution in a reasonable time that ensures the practicability when applying for a real power network. The OPP problem is solved under both normal operating and contingency conditions. Moreover, some other realistic aspects that may affect the OPP problem, such as PMU channel limitation, zero injection bus, the presence of conventional measurements, are also considered to solve simultaneously. The simulations on IEEE 14-bus, 30-bus, 57-bus, 118-bus test systems, and especially on a large-scale network—the Polish 2383-bus system, are presented for evaluating the feasibility of proposed approach. The results of this study showed that the proposed method is effective and feasible to solve the OPP problem for a real power network.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Control, Automation and Electrical Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.