Abstract

This article presents a novel method for optimal phasor measurement unit placement (OPP) for full power system observability in the presence of conventional measurements. The method considers eligible PMU placements that may be omitted by existing OPP methods and hence may provide a better solution and can guarantee that the PMU placement can restore network observability. This is achieved by creating a new observability criterion and a network transformation scheme. The new observability criterion uses injection and zero injection measurements to improve the solution and the network transformation scheme reduces the size of the OPP problem and is a prerequisite for applying the proposed observability criterion. The OPP problem is solved using binary integer linear programming (BILP) or binary integer linear programming (BILP). Therefore, the proposed OPP method can be easily combined with other OPP methods, considering other constraints/scenarios using BILP, such as OPP considering PMU current channel limits. The new method is tested using simulations of the IEEE 14-, 118-, and 2736-bus test systems. These results show that the proposed new method is feasible in terms of execution time, is free of solutions that fail to make the system fully observable, and is capable of identifying optimal placement solutions that may be overlooked by existing OPP methods.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call