Abstract
This paper investigates the application of differential evolution (DE) algorithm for the problem of optimal placement of phasor measurement units (PMUs) in an electric power network. The problem is to determine the minimum number of PMUs and their respective locations to make the system observable. In order to cope with the continuous changes in the power system's topology, the optimization problem is formulated considering not only the new PMUs to be installed but also the existing ones to be retained or relocated. Additionally, the new formulation takes into account the locations, if any, at which PMUs shall or shall not be placed. The effectiveness of the proposed method is verified via IEEE 14-bus, 30-bus, 39-bus and 57-bus standard systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.