Abstract

This paper presents an artificial bee colony (ABC) based algorithm to optimally solve the problem of allocation and the problem of design and schedule of multiple hybrid photovoltaic (PV)-diesel distributed generation in distribution systems. Both problems are solved simultaneously. The objective of the proposed algorithm is to minimize the overall investment, replacement and operation and maintenance costs of each located hybrid photovoltaic-diesel system (HPVDS). As the hybrid energy systems are grid connected, the algorithm considers also the minimization of the distribution system power loss, the amount of imported power from the transmission grid and the un-served load in case of emergency. Meanwhile, the algorithm aims to maximize the excess generated power by the HPVDS that may be injected into the distribution network. These objectives are to be achieved while satisfying the operational constraints of the system. The proposed algorithm is applied to two test systems to validate its effectiveness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.