Abstract

When grid-connected micro grid operates in island mode, the energy output of micro sources and the capacity of energy storages cannot ensure the power supply for all micro grid loads, it is necessary to remove part of micro grid loads in order to maximally guarantee the power supply for the important loads and extend the power supply time of all loads as far as possible. In this paper, an optimal load shedding strategy of micro grid based on improving the reliability of load power supply is presented, according to the power prediction of micro sources and loads during the operation of the island, charging and discharging power and surplus energy of energy storages are predicted, and the switching time of loads at different level are determined by optimization. The application of this strategy improves the power supply reliability of all the loads in the micro grid while ensuring the continuous and reliable power supply of important loads. A micro grid simulation system based on the load shedding strategy is established, and the simulation results show the correctness and practicability of the strategy.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call