Abstract

A number of models have been proposed to predict optimal setup times, or optimal investment in setup reduction, in manufacturing cells. These have been based on the economic order quantity (EOQ) or economic production quantity (EPQ) model formulation, and have a common limitation in that they neglect work-in-process (WIP) inventories, which can be substantial in manufacturing systems. In this paper a new model is developed that predicts optimal production batch sizes and investments in setup reduction. This model is based on queuing theory, which permits it to estimate WIP levels as a function of the decisions variables, batch size and setup time. Optimal values for batch size and setup time are found analytically, even though the total cost model was shown to be strictly non-convex.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.