Abstract

We consider the problem of choosing the number and type of machines for each station in a new production line where the sequence of processes (i.e., manufacturing recipe) has already been established. We formulate a model to minimize cost (investment plus operating) subject to constraints on throughput and cycle time. Using queueing network approximations within a dynamic programming framework, we develop a line design algorithm that works in station-wise fashion. For computational tractability, we must discretize a continuous state space. However, we are able to compute bounds on the error in the cost function as a guide to the appropriate choice of grid size. We conclude by applying our algorithm to an industrial problem that motivated this work.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.