Abstract
The traditional maximum power point tracking (MPPT) algorithm can not track the maximum power point (MPP) quickly and accurately in the environment of rapidly changing illumination amplitude. In this paper, based on the basic circuit model of solar cell, the small signal model between the disturbance step size of MPPT algorithm near the maximum power point and the intensity of light irradiance, ambient temperature, working voltage and working current is used, and then the MPPT duty cycle disturbance is modelled and analysed. The simulation results show that the model proposed in this paper clarifies the mechanism of the disturbance step size of MPPT algorithm in the environment of rapidly changing illumination amplitude. It also provides a theoretical basis for the design of subsequent disturbance step size.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.