Abstract

This paper considers due-date determination and sequencing of n jobs on a single-machine where each job is given a constant flow allowance. The objective is to determine the optimal value of the flow allowance and the optimal job sequence to minimize a cost function based on the flow allowance and the job earliness and tardiness values. We first propose a linear programming (LP) formulation of the problem and then derive the optimal constant flow allowance via considering the LP dual problem. We show that the optimal constant due-date value is independent of job sequence. After the theoretical treatment, a numerical example is presented for discussion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.