Abstract

This paper considers the sequencing of n jobs in a single-machine shop in which each job is assigned a constant flow allowance. The objective is to determine the optimal value of the flow allowance and the optimal job sequence to minimize a cost function based on the flow allowance and the job earliness and tardiness values. We first propose a linear programming (LP) formulation of the problem. We then derive the optimal constant flow allowance via considering the LP dual problem and show that it is independent of the job sequence. After the theoretical treatment, a numerical example is presented for discussion.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.