Abstract

The common due-date problem involves minimizing the absolute deviation around a common due-date. An interesting variation modifies the problem so that no penalty costs are incurred for jobs completing within the tolerance interval of the common due-date. For tolerance intervals that are less than half the execution time of the shortest job, solution techniques have been developed. However, the techniques do not extend to tolerance intervals of any arbitrarily chosen size. In this paper, for a variety of penalty functions we develop a polynomial time solution algorithm for any size tolerance interval. We also demonstrate how optimizing techniques developed in this paper can be applied to a common due-date problem with a partial set of fixed jobs and a predetermined common due-date.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.