Abstract
The article describes the applied research findings on selecting a resource-saving technology to ensure drastic reduction in loss of high-grade Kyshtym quartz. The economical–mathematical modeling yields relationships between mine efficiency, ground conditions, mine design and technology factors, and the optimal variant of a combination mining technology is determined using the maximum profit criterion. Full-scale physical simulation of closed-spaced charge blasting effect on reduction in overgrinding of quartz is discussed. Drilling and blasting pattern for experimental breaking of quartz by explosions is determined.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have