Abstract
Problem statement: In a competitive electricity market with limited number of producers, Generation Companies (Gencos) is facing an oligopoly market rather than a perfect competition. Under oligopoly market environment, each Genco may increase its own profit through a favorable bidding strategy. The objective of a Genco is to maximize its profit and minimize the associated risk. In order to achieve this goal, it is necessary and important for the Genco to make optimal bidding strategies with risk management before bidding into spot market to get an expected high profit, since spot prices are substantially volatile. This study propose a method to build optimal bidding strategies in a day-ahead electricity market with incomplete information and considering both risk management and unit commitment. Approach: The proposed methodology employs the Monte Carlo simulation for modeling a risk management and a strategic behavior of rival. A probability density function (pdf), Value at Risk (VaR) and Monte Carlo simulation used to build optimal bidding strategies for a Genco. Results: The result of the proposed method shows that a Genco can build optimal bidding strategies to maximize expected total profit considering unit commitment and risk management. The Genco controls the risk by setting the confidence level. If the Genco increase the confidence level, the expected total VaR of profit decrease. Conclusions/Recommendations: The proposed method for building optimal bidding strategies in a day-ahead electricity market to maximize expected total profit considering unit commitment and risk management is helpful for a Genco to make a decision to submit bidding to the Independent System Operator (ISO).
Highlights
Deregulation and reforming in the electricity market have created a competitive open market environment
The supply curve is built up for each hour considering the selling bids ordered by increasing prices and a demand curve is built up considering the buying bids ordered by decreasing prices
This study proposes a method to build optimal bidding strategies in a day-ahead electricity market with incomplete information and considering both risk management and unit commitment
Summary
Deregulation and reforming in the electricity market have created a competitive open market environment. The Genco operate own generating resources independently according their individual profits. In order to achieve this goal, its necessary and important for the Genco to make optimal bidding strategies with risk management before bidding into a spot market to get an expected high profit, since spot prices are substantially volatile. The supply curve is built up for each hour considering the selling bids ordered by increasing prices and a demand curve is built up considering the buying bids ordered by decreasing prices. The intersection of the supply curves and demand curves determines the selling and buying bids that are accepted. The hourly market price is the price of the last accepted selling bid. This process results in a uniform price for every hour
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: American Journal of Engineering and Applied Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.