Abstract

With the potential of low levelized cost of electricity (LCOE) and high dispatchability, the hybrid solar and biomass power (HSBP) plant will become an increasingly attractive alternative of fossil energy in the future. However, the combination of biomass fuels, uncertain solar energy and thermal energy storage (TES) system makes energy flow in HSBP plant more intricate. This problem poses a significant challenge to HSBP plant operation in the electricity markets especially with uncertain market prices. In this paper, the linear operation model of HSBP plant is developed to describe the intricate energy flow and technical constraints. In order to maximize the revenues of HSBP plant in electricity markets, an optimal operation strategy is proposed by taking into account the daily variation of market prices. The uncertainties of solar irradiation and market prices are modeled with stochastic programming approach, i.e. a set of scenarios. The large number of scenarios is reduced to relieve the computational burden of mixed integer linear programming (MILP) problem. In addition, the conditional value at risk (CVaR) is adopted to consider the risk hedge. The validity of the proposed model is demonstrated by case study results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.