Abstract

Three large blast furnaces of NKK have been shifted to the operation without liquid fuel one after another since January, 1980, and the oil-less operation of all blast furnaces was finally achieved in April, 1980. Fukuyama No. 3 Blast Furnace (3223m3), has been operated with increased blast volume and higher blast temperature in order to solve operational problems and achieve improved operation. Although increased slips and fluctuations in blast pressure have been often observed in the operations when the flame temperature is high, all furnaces have been in smooth operation owing to the proper gas distribution control and furnace heat control. By the calculations based on operational results, a productivity of as high as 2.3t/m3/d can be expected on a monthly averaged value in all-coke operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.