Abstract

In order to explore operation scheme of downstream controlling reservoir in water source area for optimized allocation of inter-basin water resources, this paper selected the south-to-north water diversion middle route project in Hanjiang River basin as an instance. The optimized dispatching mode of Danjiangkou Reservoir is built with multiple dispatching objective functions and different dispatching scenarios set, such as maximum water supply during water supply period, minimum discharge, minimum abandoned water and maximum power generation. The simulation results indicate that the model and methods proposed in this paper are feasible and effective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.