Abstract
Railway plays a significant role in improving connectivity and generates economic growth of a nation. The contract in railway has been discussed to improve industry railway competitiveness in the past decades not only in developed countries but also developing countries such as Indonesia. The country attempt to build railway tracks across the country, but the contract for operation and maintenance remain a question. The paper attempts to support the mechanism of operation and maintenance contract and use railway project in the country as the case study. The research uses a combination of qualitative and quantitative approaches through the in-depth interview and questionnaire survey. It distributed to key stakeholders related to railway and infrastructure project consist of a government institution, private investor, a state-owned enterprise, and local-owned enterprise. The result shows that performance-based contract is the most suitable for the railway industry. It shall consider duration and the contract value to select the best contract. The project prefers to be managed by private investors or local-owned enterprise. Business entity selection shall consider their company reputation, licensing requirement, and healthy financial structure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Innovative Technology and Exploring Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.