Abstract
Integrating the operation of airborne wind energy systems safely into the airspace requires a systematic qualification process. It seems likely that the European Union Aviation Safety Agency will approve commercial systems as unmanned aircraft systems within the “specific” category, requiring risk-based operational authorization. In this paper, we interpret the risk assessment methodology for airborne wind energy systems, going through the ten required steps of the recommended procedure and discussing the particularities of tethered energy-harvesting systems. Although the described process applies to the entire field of airborne wind energy, we detail it for a commercial flexible-wing airborne wind energy system. We find that the air risk mitigations improve the consolidated specific assurance and integrity level by a factor of two. It is expected that the framework will increase the safety level of commercial airborne wind energy systems and ultimately lead to operation approval.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.