Abstract

In transmission lines, shunt-reactors are commonly applied to counteract the “Ferranti effect.” However, in highly compensated lines, hazardous overvoltage may occur during unbalanced open-phase conditions. In addition, when a new substation is put into operation, π circuit can be selected by accessing an existing transmission line and the original shunt-reactor configuration is maintained. Severe overvoltage may occur on the shunt-reactor side of the newly installed transmission line. In this study, we analysed the effects of compensation, neutral-reactor, and system frequency on open-phase overvoltage. The maximum deviation of system frequency is <±0.5 Hz, therefore, we suggested maximum critical compensation of the shunt-reactor under different proportional coefficients of neutral-reactor. We analysed the impact of line division, when an intermediate substation is accessed, and a risk range in which the substation located may cause severe overvoltage was proposed. Finally, according to an actual line division project, we optimised the original configuration scheme of the shunt and neutral-reactors. We used electromagnetic transient simulation to verify whether severe overvoltage occurred before and after the power station is accessed. The study results may provide guidance for selection of the π circuit accessing point and for optimising the configuration of the shunt and neutralreactors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.