Abstract

This paper presents a study of Temporary Overvoltage (TOV) on the Manitoba Hydro rectifier system under the proposed development of a new HVDC link and generations. The TOV assessment is based on a full load rejection of three Bipoles, which should result in the highest temporary fundamental frequency overvoltage. The detailed PSSE TOV studies include several system topologies regarding generation and transmission line connections as well as new converter ratings. The paper also discusses the relationship between the system strength described by Multi-Infeed Effective Short Circuit Ratio (MIESCR) and the TOV. A more general analytical equation for estimating TOVs was derived by introducing a multiplying factor related to Bipole parameters. The validation of the equation based on PSSE studies indicates that the revised equation could be used as a screening tool for predicting TOVs in a multi-infeed system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.