Abstract
This work deals with a very generic class of scheduling problems with identical/uniform/unrelated parallel machine environment. It considers well-known attributes such as release dates, deadlines, or sequence-dependent setup times and accepts any objective function defined over job completion times. Non-regular objectives are also supported. We introduce a branch-cut-and-price algorithm for such problems that makes use of non-robust cuts, i.e., cuts which change the structure of the pricing problem. This is the first time that such cuts are employed for machine scheduling problems. The algorithm also embeds other important techniques such as strong branching, reduced cost fixing and dual stabilization. Computational experiments over literature benchmarks showed that the proposed algorithm is indeed effective and could solve many instances to optimality for the first time.
Submitted Version (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.