Abstract
This study involves an unrelated parallel machine scheduling problem in which sequence-dependent set-up times, different release dates, machine eligibility and precedence constraints are considered to minimize total late works. A new mixed-integer programming model is presented and two efficient hybrid meta-heuristics, genetic algorithm and ant colony optimization, combined with the acceptance strategy of the simulated annealing algorithm (Metropolis acceptance rule), are proposed to solve this problem. Manifestly, the precedence constraints greatly increase the complexity of the scheduling problem to generate feasible solutions, especially in a parallel machine environment. In this research, a new corrective algorithm is proposed to obtain the feasibility in all stages of the algorithms. The performance of the proposed algorithms is evaluated in numerical examples. The results indicate that the suggested hybrid ant colony optimization statistically outperformed the proposed hybrid genetic algorithm in solving large-size test problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.