Abstract

An algorithm is proposed for the automatical design of large multi-purpose batch chemical plants. This first design is improved in an iterative process by alternatively evaluating the plant through the solution of the scheduling problem, and changing the plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call