Abstract

We prove that a maintenance problem on frequency-constrained maintenance jobs with a hierarchical structure is integer-factorization hard. This result holds even on simple systems with just two components to maintain. As a corollary, we provide a first hardness result for Levi et al.'s modular maintenance scheduling problem (Levi et al. 2014).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call