Abstract

This paper addresses the non-preemptive on-line scheduling of parallel jobs. In particular we assume that the release dates and the processing times of the jobs are unknown. It is already known that for this problem Garey and Graham's list scheduling algorithm achieves the competitive factor 2− 1 m for the makespan if m identical machines are available and if each job requires only a single machine for processing. Here, we show that the same factor also holds in the case of parallel jobs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call