Abstract
ABSTRACT Despite the need to ensure that operations at the end of the infrastructure life cycle are carried out in a safe and efficient manner, there is no systematic risk analysis study tailored specifically for renewable energy decommissioning. This paper aims to propose qualitative and quantitative approaches for identifying and prioritising different hazards associated with decommissioning of offshore wind farms. The potential hazards are identified through well-established techniques such as hazard identification (HAZID), fault tree analysis (FTA), event tree analysis (ETA) and risk matrix. Four levels of consequence are considered in the risk analysis process. The results reveal that the lifting and loading are the most safety-critical operations during the decommissioning; hence, they will require specific attention for safety management improvement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.