Abstract

Delay in construction projects is increasing the execution time of the settlement that has been planned and listed in the contract documents. The delay will result in losses for the parties associated especially the owner and the contractor because generally accompanied conflict, the demands of time and cost as well as deviations from the quality of the completion of the project .the research is aimed to know the factors that most affect the delay of the projected Revitalization of the Taman Ismail Marzuki. Data collection techniques used is literature study, observarsi, interviews/questionnaires. The determination of the population in this research is taken from some of the respondents with the use of the sample. Data analysis in research this using validity test, reliability test, correlation test and regression test with the statistical program SPSS 26.Based on the analysis that has been done there are 11 variables that affect the delay of the work structure under the building of the guesthouse on the project to work withk revitalization of the taman ismail marzuki stage 1 and there are 3 variables that are dominant, namely the lack of expertise of most work, the design changes,the number of repair work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call