Based on Dalian subway line 2 from Chun-guang street station to Xiang-gong street station,the three dimensional finite element model was established using FLAC3D software , the shield excavated surface against the pressure, the stress release, the shield tail escape and grouting. The numerical result indicated that the pipeline displacement increases gradually with the advance of the tunnel excavation. When one-sided tunnel excavation is carried out, the largest displacement is located at the tunnel axis, the settling curve basically conforms to the normal distribution curve with the unimodal characteristic. The excavation of right-side tunnel is disadvantageous to the left-side tunnel. The analysis indicated that the pipeline is in a secure state. The work in this paper provided theoretical basis and the practical guidance to this project.