Abstract

The hydroforming process is characterized in these recent years by the remarkable development to compare with other processes manufacturing such as deep drawing and bending... Hydroforming is a reliable process that improves the resistance and rigidity of parts with the geometrical and dimensional tolerances allowing for lower costs tool and therefore an overall cost of manufacturing reduced. The success of hydroforming process requires the control simultaneously of various parameters such as used material properties, thickness, internal pressure,... In this paper, we introduce our model based in a neural approach (ANN) compared to the numerical simulation and experimental results. This method allows a better thickness distribution during Tee extrusion tube hydroforming process (THF) and the optimization of the final part geometry. A multilayer’s neural networks (MNN) program is used to control the tube wall thickness variation, so the loading paths (axial feeding and the internal pressure) are used like inputs for our networks, the thickness is the output.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.