Abstract

This paper goes through the main three stages, planning, design and construction, of a singular port infrastructure: the new western breakwater of Almería port. The main issues of each of these phases are outlined along this document, aiming to present the complete cycle of this protection infrastructure, from its conception and design to its materialization.The article is mainly focused on the design stage, since this case is special for having been developed by means of level I and level III Methods. Level III methods are a relatively novelty both in the national and international scenario, since they use probabilistic methods for the design. This article could be considered as a guide for the design of future breakwaters, as it includes the standard methodology for level I methods as well as the procedure for verifications by means of level III methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.