Abstract
To improve capacity and reduce processing time, the flow shop with multiprocessors (FSMP) system is commonly used in glass, steel, and semiconductor production. No-wait FSMP is a modern production system that responds to periods when zero work is required in process production. The production process must be continuous and uninterrupted. Setup time must also be considered. Just-in-time (JIT) production is very popular in industry, and timely delivery is important to customer satisfaction. Therefore, it is essential to consider the time window constraint, which is also very complex. This study focuses on a no-wait FSMP problem with time window constraint. An improved ant colony optimization (ACO), known as ant colony optimization with flexible update (ACOFU), is developed to solve the problem. The results demonstrate that ACOFU is more effective and robust than ACO when applied to small-scale problems. ACOFU has superior solution capacity and robustness when applied to large-scale problems. Therefore, this study concludes that the proposed algorithm ACOFU performs excellently when applied to the scheduling problem discussed in this study.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.